MIT Steel Bridge team won 2nd place at nationals
Published on:
Jun 04, 2013
Jun
04
2013
Share
The MIT Steel Bridge team won first place in economy and second place overall at the national competition held May 31-June 1 at the University of Washington in Seattle. Each team was required to develop an original design for an approximately 20-foot bridge created for a hypothetical site. Teams are judged on a combination of elements, including bridge design and weight, its ability to withstand a 2,500-pound load without sagging, number of builders and team construction speed. MIT’s build time was 5:32 minutes. This is the second year the MIT team has placed second. The University of California at Berkeley won first place this year and last.